| Operating results |
|
|
|
|
|
|
| Underground operations |
|
|
|
|
|
|
| Metric tonnes milled |
000 |
13,489 |
13,806 |
13,554 |
13,047 |
13,426 |
| Yield |
g/t |
7.20 |
7.31 |
7.50 |
8.03 |
8.27 |
| Produced |
oz 000 |
3,123 |
3,243 |
3,270 |
3,367 |
3,569 |
| Productivity |
g/employee |
|
|
|
|
|
| target |
|
279 |
286 |
270 |
236 |
247 |
| actual |
|
256 |
257 |
254 |
228 |
238 |
| Surface and dump reclamation |
|
|
|
|
|
|
| Metric tonnes treated |
000 |
12,414 |
8,061 |
7,102 |
36,822 |
38,366 |
| Yield |
g/t |
0.50 |
0.52 |
0.60 |
0.27 |
0.30 |
| Produced |
oz 000 |
201 |
136 |
138 |
320 |
365 |
| Open-pit operations |
|
|
|
|
|
|
| Metric tonnes mined |
000 |
173,178 |
168,904 |
135,171 |
125,529 |
97,030 |
| Stripping ratio (1) |
|
4.82 |
5.02 |
6.34 |
8.95 |
6.18 |
| Metric tonnes treated |
000 |
26,739 |
25,541 |
18,236 |
13,967 |
13,682 |
| Yield |
g/t |
2.14 |
2.74 |
3.21 |
3.43 |
3.80 |
| Produced |
oz 000 |
1,843 |
2,246 |
1,883 |
1,540 |
1,673 |
| Heap-leach operations |
|
|
|
|
|
|
| Metric tonnes mined |
000 |
63,519 |
61,091 |
71,837 |
59,507 |
51,192 |
| Metric tonnes placed (2) |
000 |
23,329 |
22,227 |
22,120 |
18,265 |
13,504 |
| Stripping ratio (1) |
|
1.83 |
1.97 |
2.08 |
2.59 |
2.63 |
| Recoverable gold placed (3) |
kg |
18,162 |
18,500 |
18,670 |
14,976 |
14,228 |
| Yield (4) |
g/t |
0.78 |
0.83 |
0.84 |
0.81 |
1.05 |
| Produced |
oz 000 |
468 |
541 |
538 |
389 |
332 |
| Total gold produced |
oz 000 |
5,635 |
6,166 |
5,829 |
5,616 |
5,939 |
| South Africa |
oz 000 |
2,554 |
2,676 |
2,857 |
3,281 |
3,412 |
| Argentina |
oz 000 |
215 |
211 |
211 |
209 |
179 |
| Australia |
oz 000 |
465 |
455 |
410 |
432 |
502 |
| Brazil |
oz 000 |
339 |
346 |
334 |
323 |
299 |
| Ghana |
oz 000 |
592 |
680 |
485 |
|
|
| Guinea |
oz 000 |
256 |
246 |
83 |
|
|
| Mali |
oz 000 |
537 |
528 |
475 |
577 |
710 |
| Namibia |
oz 000 |
86 |
81 |
66 |
73 |
85 |
| Tanzania |
oz 000 |
308 |
613 |
570 |
331 |
290 |
| USA |
oz 000 |
283 |
330 |
329 |
390 |
462 |
| Zimbabwe |
oz 000 |
|
|
9 |
|
|
| Price received |
$/oz sold |
577 |
439 |
394 |
363 |
303 |
| Total cash costs |
$/oz produced |
308 |
281 |
264 |
214 |
150 |
| Total production costs |
$/oz produced |
414 |
374 |
332 |
263 |
197 |
| Capital expenditure |
$m |
817 |
722 |
585 |
449 |
337 |
| Monthly average number of employees |
|
61,453 |
63,993 |
65,400 |
55,439 |
54,042 |
| LTIFR |
|
7.70 |
6.77 |
6.56 |
8.83 |
8.86 |
| FIFR |
|
0.22 |
0.14 |
0.19 |
0.29 |
0.31 |
| Rand/dollar average exchange rate |
6.77 |
6.37 |
6.44 |
7.55 |
10.48 |
| Rand/dollar closing exchange rate |
7.00 |
6.35 |
5.65 |
6.67 |
8.58 |
| Australian dollar/dollar average exchange rate |
1.33 |
1.31 |
1.36 |
1.54 |
1.84 |
| Australian dollar/dollar closing exchange rate |
1.27 |
1.36 |
1.28 |
1.33 |
1.79 |
| Brazilian Real/dollar average exchange rate |
2.18 |
2.44 |
2.93 |
3.07 |
2.92 |
| Brazilian Real/dollar closing exchange rate |
|
2.14 |
2.35 |
2.65 |
2.89 |
3.53 |
| (1) |
Stripping ratio = (total tonnes mined ore tonnes mined)/ore tonnes mined. |
| (2) |
Tonnes placed onto leach pad. |
| (3) |
Recoverable gold placed onto leach pad inventory. |
| (4) |
Recoverable gold placed/tonnes placed. |
|