Summarised group operating results



20052004(5) 20032002 2001

Operating results

Underground operations
Metric tonnes milled000 13,80613,55413,04713,42617,954
Yieldg/t 7.317.508.038.278.20
Produced oz 000 3,243 3,2703,367 3,5694,734
Productivity
g/employeetarget 286270236247219
 actual 257 254228238 214
Surface and dump reclamation
Metric tonnes treated000 8,0617,10236,82238,36650,355
Yieldg/t 0.520.600.270.300.32
Produced oz 000 136 138320365 514
Open-pit operations
Metric tonnes mined000 168,904135,171125,52997,03051,667
Stripping ratio(1) 5.026.348.956.186.93
Metric tonnes treated000 25,54118,23613,96713,68215,294
Yieldg/t 2.743.213.433.802.99
Produced oz 000 2,246 1,8831,540 1,6731,469
Heap-leach operations
Metric tonnes mined000 61,09171,83759,50751,19234,123
Metric tonnes placed(2)000 22,22722,12018,26513,50411,748
Stripping ratio(1) 1.972.082.592.631.73
Recoverable gold placed(3)kg 18,40118,53414,78214,22810,668
Yield(4)g/t 0.830.840.811.050.91
Produced oz 000 541 538389332 266
Total gold producedoz 000 6,1665,8295,6165,9396,983
– South Africaoz 000 2,676 2,8573,2813,412 4,670
– Argentinaoz 000 211211209179 136
– Australiaoz 000 455410432502 508
– Braziloz 000 346334323299 305
– Ghanaoz 000 680485
– Guineaoz 000 24683
– Malioz 000 528475577710 508
– Namibiaoz 000 81667385 87
– Tanzaniaoz 000 613570331290 273
– USAoz 000 330329390462 496
– Zimbabweoz 000 9
Price received$/oz sold 439394363303287
Total cash costs$/oz produced 281264214150166
Total production costs$/oz produced 374332263197205
Capital expenditure $m 722 585449337 382
Monthly average number of employees 63,99365,40055,43954,04270,380
LTIFR6.756.568.838.8610.55
FIFR  0.14 0.190.29 0.310.25
Rand/dollar average exchange rate 6.376.447.5510.488.62
Rand/dollar closing exchange rate 6.355.656.678.5811.96
Australian dollar/dollar average exchange rate 1.311.361.541.841.93
Australian dollar/dollar closing exchange rate 1.36 1.281.33 1.791.96
(1) Stripping ratio = (total tonnes mined – ore tonnes mined)/ore tonnes mined.
(2) Tonnes placed onto leach pad.
(3) Recoverable gold placed into leach pad inventory.
(4) Recoverable gold placed/tonnes placed.
(5) 2004 comparatives restated to comply with current year disclosures.

Annual Report 2005